Hot sale wholesale ODM bath tub kneeler mat with elbow rest pad

FOB Reference Price:Get Latest Price
$5.00 - $8.00 / Piece | 300 Piece/Pieces (Min. Order)
Color:
Lead Time:
Quantity(Pieces) 1 - 500 >500
Est. Time(days) 25 Negotiable
Customization:
Customized logo (Min. Order: 500 Pieces)
Customized packaging (Min. Order: 300 Pieces)

More

Graphic customization (Min. Order: 500 Pieces) Less
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Zhejiang, China (Mainland)
Brand Name:
Artamber
Model Number:
AMBK-0080
Material:
Neoprene, Neoprene
Feature:
Eco-Friendly
Technics:
Non-woven Textile
Pattern:
Animals
Style:
New Classical/Post-modern
Size:
60*40cm
Package:
1 set / oppbag
LOGO:
acceptable customer's logo
Color:
ODM
Product name:
Hot sale wholesale ODM bath tub kneeler mat with elbow rest pad
MOQ:
300 pcs
Thickness:
3cm/3.8cm
PAYMENT:
T/T
Delivery time:
25 days
Supply Ability
Supply Ability:
10000 Piece/Pieces per Week
Packaging & Delivery
Packaging Details
Each set into a color box
Port
ningbo
Lead Time :
Quantity(Pieces) 1 - 500 >500
Est. Time(days) 25 To be negotiated

  1_.png

2019_09_24 18_31You just need to provide the artwork,then we can customize for you without extra cost.Please contact with us for more information

Product Description
MaterialNeoprene
Size60*40*3.8cm
Package1 set / oppbag
ColorSame as below picture or according to your request
FeatureEco friendly ,anti-slip ,foldable ,water friendly ,quick drying ,machine washable
SampleExist sample for free, OEM sample according to the artwork
LOGOacceptable customer's logo
MOQ300 sets
Leading time25days
FOB portNingbo
Payment terms30% deposit in advance, 70% balance before shippment

 

2 (2).jpg2 (4).jpg3 (1).jpg3 (3).jpg3 (4).jpg4 (6).jpg4 (7).jpgynse19-09-25 16_57 (1)

 

Company Information

Company Introduction1.jpg 

Customer Trust

photobank.jpg 

Packaging & Shipping

1.  It will be better to ship by express or by air for small quantity.

The freight charge will be not expensive and you can receive the goods in 3-7days.

 

2.  It will be better to ship by sea if the quantity is above 1000pcs. You can save much cost

It will take about 15-40 days, the specific sailing time depends on different destination.

 

3.  For Amazon customer, we have full experience service of DDU FBA, you only have to take care of the sales on Amazon, and we do all the rest things.

FAQ

Q1. Are you factory?

A1: Yes, We are a professional Manufacturer

 

Q2: What’s your advantage? Why we choose you?

A2: 1) Great production capacity Sustainable Supply. According to customer requirements.

We support the customized include package.

2) We use 100% new materials and the best production process, inconsequence our defective rate is lower than 0.01%

 

Q3: How can we get a sample?

A3: If you need our ready samples, we can provide it for free but the freight charge will be on your account. If you need to make the customized sample, you can contact with us to discuss more

 

Q4: What package do you use for the products?

A4: Usually we have professional retail package for the products. Customized package are also available based on certain MOQ.

  

Q5: Can you help have a custom logo printed on the product?

A: Yes, we can. We could do screen printing, heat transfer printing or embroidery on your products.

 

Q6: How to prepare my artwork files for printing?

A6:The artwork format could be AI,PDF,CDR,PSD.To avoid any possible delay in your production we would highly recommend you to check the artwork requirements first before sending your artwork.

 

Q7: Can you do the design for us?

A7: Yes. We have a professional team having rich experience in trophy design and manufacturing. Just tell us your ideas and we will help to carry out your ideas into perfect trophy.

 

Q8: How is your quality control? 

Our quality control steps include: 

 (1) Confirm everything with our client before moving to sourcing and production; 

 (2) check all the materials to ensure they are correct; 

 (3) Employ experienced workers and give them proper training; 

 (4) Inspection throughout the whole production process; 

 (5) Final inspection before loading.